CASE STUDY

Factory Avoid £20,000 in Equipment Costs

Client

Bowles and Walker is a specialised manufacturing business based near Thetford in East Anglia. Learn more about the business at www.bowles-walker.com.

 

Background

The company specialises in plastic injection moulding and boasts in-house tool making facilities, manufacturing a diverse range of products.

Client sectors span as far as engineering, retail, medical and pharmaceutical industries within the UK, Europe and the United States.

 
 

Need

Bowles and Walker have significant energy demands due to their large scale industrial machinery.

Appliance-level energy monitoring was a key requirement for the business as given the scale and use-level of their specialist machines, efficiency disparities come at huge extra cost.

Result

Bowles and Walker have avoided £20,000 in total costs through using GridDuck. To read the full case study, see below. Contact us to learn more.

 

Download the full case study

If you’d like to learn more about what we offer, please schedule a meeting using Calendly.

Previous
Previous

Manufacturer Saves 4.5 MWh a Year on One Appliance

Next
Next

Fruit Farm Saves 45% With Behaviour Changes